SERVICE :
STRUCTURAL ENGINEERING, INVESTIGATION AND REPAIR
BUILDING :
COMMERCIAL
MATERIAL :
CONCRETE
Project consisted of removing the existing deteriorated vaulted sidewalk. The existing beams and columns were reinforced and a new split slab vaulted sidewalk constructed. K2N Crest developed the repair program, compiled repair documents and provided bidding services.
Once a repair contractor was selected K2N provided construction administration services. This included on-site observation, reviewing submittals, change orders, payment applications and verifying that the contract documents were followed.